Areas of Operation 
OUR PARTNERSHIP PROPERTIES
Aztec Oil & Gas, Inc. has numerous partnership properties. Most recently, their partnership properties have been exclusive to Texas, however, in the past they have traveled outside the state. The map to the right demonstrates the general drilling areas Aztec is involved in per the Texas Railroad Commissions' boundaries.

Click map to enlarge.
 
Aztec Partnership Properties Portfolio
Area
LP Name Details/Summary
Doddridge County, West Virginia
2006 A
This was an Appalachian four (4) well developmental gas package. All four (4) wells were successfully drilled and completed and continue to produce to date. Well Names: Freeman #1, Freeman #2, Freeman #3 and Freeman #4.
Tyler County, West Virginia
2006 B This was an Appalachian two (2) well natural gas package consisting of the Dailey Heirs #1 and the Hickman #1. Successfully drilled and completed the Hickman which is producing; however, the Dailey Heirs well has not responded to completion applications.
Tyler County, West Virginia
2007 A
This was an Appalachian two (2) well gas package located in West Virginia. Both wells were natural gas wells and both were drilled and successfully completed and continue to produce. Well Names: William #1 and William #2.
Goliad County,
Texas

VIII A
The VIII A LP consists of four (4) shallow natural gas wells located in Goliad County, Texas. All four (4) wells were successfully drilled and completed in the 1st quarter of 2009. By July 2009, all four (4) wells are equipped and producing.  
Upper Gulf Coast, NW & East Texas
VIII B
The VIII B LP was funded and closed on June 17th of 2009. Wells in this Partnership have been drilled and completion is ongoing. Partial monthly distributions have begun. The LP wells should be totally completed and in complete revenue status by October 2010.
Total Wells Included: 35+

Upper Gulf Coast, NW & East Texas VIII C
The VIII C LP was funded and closed on August 31, 2009. Wells in this Partnership have been drilled and completion is ongoing. Partial monthly distributions have begun. The LP wells should be totally completed and in complete revenue status by October 2010.
Total Wells Included: 30+

Upper Gulf Coast, NW & East Texas X-A
The X-A LP was funded and closed on December 31, 2009. Wells in this Partnership have been drilled and completion is ongoing. Partial monthly distributions have begun. The LP wells should be totally completed and in complete revenue status by October 2010. First revenue to be distributed 8/10/2010.
Total Wells Included: 40+

Upper Gulf Coast, NW & East Texas X-B The X-B LP was funded and closed on May 31, 2010. Funds are currently being deployed for drilling in multiple Texas Counties.
Disclaimer: All dates, depths and production numbers are approximate. Information is updated periodically for select properties. Information included in these reports is supplied by third parties not under control of Aztec and Aztec does not assume responsibility for its accuracy above making a reasonable effort to ascertain same.